A brick built high level coaling facility to refuel the locomotive tenders with coal. Fuel is brought to the building via a ramp (not supplied). Use brick sheets (M0054) for the retaining walls. (190mm x 105mm 7 1/2" x 4 1/8") excluding the steps
Recommend this to a friend +
Message: (optional)
Recommend to Friend